Project Summary |
Sample Photographs |
|
Soda-Ash Project Client: Williams Pipeline Company. Location: Colorado Williams Pipeline has requested L.W. Survey to perform Engineering Survey and Drafting services on dual pipelines (2) located in Grand Junction Colorado (Sodas Slurry Line) 45 miles. This particular project will consist of preliminary Engineering, drafting and As-Built services. Construction slated to be completed by August 15, 2000. The project will require a detail survey on all lines, this is an existing corridor vertical will have a big impact on this survey due to the lines being slurry lines. This project will start June 1, 1999 and will continue until all information is gathered possibly late December of 1999 and returning April, 2000 for construction.
|
|